CUSTOM HOME BUILDING STEPS

Custom Home Building Steps

CUSTOM HOME BUILDERS IN SAN ANGELO, TX

Before you consider looking at homes for sale, consider this: new home construction means you know what you're getting, you don't need to be worried about previous damage and you can customize the house that suit your specific needs.  
BUILD FOUNDATION
• Foundation workers lay out foundation
• Plumber runs drain lines
• Foundation workers finish framing foundation and dig trenches 
• Plumber runs pex (plastic water lines), finishes rough out, and takes first of the three draws
• Foundation workers tie steel (rebar) 
• Electrician sets floor plugs and/or island wire
• HVAC runs vents if necessary
 • Treat for termites
• Pour foundation

FRAMING BEGINS
• Order windows
• Order special plumbing fixtures
• Order front and back doors
• Select and order garage doors 
• Pick roof shingles
• Pick brick
• Order cabinets
• Put felt on after decking
• Put windows in
• Put in doors and construction locks 
• Finish framing, order inspection

TOP OUT
• Pick style of trim (crown mold, baseboard, and interior doors)
• Order interior doors and trim
• Electrician runs wiring
• Plumber sets tubs, outside faucets, and drain vents through the roof, plumber gets 2nd draw
• HVAC ducts and set inside unit
• Pest control system installed
• Sound and security wiring
• Brick anytime in next month
• Stain concrete (before insulation between sheetrock and tape/float or after tape/float before staring trim)
• Insulation • Sheetrock
• Order tile • Order carpet
• Order countertops
• Pick light fixtures and fans
• Pick lockout package (door knobs, towel holders, toilet fixtures, door stops, closet rods, and so forth)
• Tape/float/texture
• Install garage doors
TRIM STARTS
• Install cabinets
• Install interior doors
• Trim baseboards, crown molding, chair rail, etc.
• Paint and/or stain

TRIM OUT
• Install light fixtures and fans

HVAC
• Hang vent covers and set outside unit

FLOORING
• Install tile and/or wood flooring

PLUMBING
• Set counter/vanity tops
• Trim out plumbing and plumber collects 3rd draw

DRIVEWAY AND SIDEWALKS
• Finalize concrete driveway and sidewalks

LOCK OUT
• Hang doors • Install door knobs, towel holders, toilet fixtures, door stops, closet rods, and so forth

CARPET
• Install carpet

ORDER FINAL INSPECTIONS 
• Order gas installed 
• Electrical, call WTU for permanent hook up after inspection by city
• Plumbing
• Mechanical
• Total final

TOUCH UP PUNCH LIST
• Make a punch list

FINALIZE PAPERWORK
• Move in and enjoy your new home!

CALL (325) 270-3724 TO LEARN MORE!